Kogeneracja, zasilacze UPS, falowniki, soft-starty

Spomlek

Trigeneration

  • Electrical power: 999kW
  • Thermal power: 1127kW
  • Cooling power: 880kW
  • Fuel: natural gas

Container: MWM TCG 2020 V12 Combined Heat and Power (CHP) unit with an electrical output of 999kW including an exchanger on the flue gas and the technological system of the unit inside and on the roof of the container.

Chiller with a cooling capacity of 88kW.

Construction of a transformer station for the derivation of electrical power from the cogeneration unit, together with a power derivation line and connection to the Investor's grid. The transformer station is equipped with MV, LV switchgears and a transformer.

An underground gas installation, civil works, foundations for the genset and buffer tank, as well as a cube have also been completed